Dura Vermeer Achieves Project Controls Excellence with Primaned and Oracle Primavera Cloud
INDUSTRY
Construction and Engineering
CHALLENGE
Dura Vermeer was working with fragmented, outdated project controls systems. That created inefficiencies, made collaboration harder, and limited visibility. They needed a scalable, integrated solution that could support both small and large projects, improve collaboration, and provide real-time insights.
RESULTS
With Oracle Primavera Cloud in place, Dura Vermeer moved to a single, unified project controls platform. Teams collaborated more easily, accessed real-time insights, and made proactive decisions. The result: higher efficiency, lower risk, and projects delivered on time and within budget.
KEY PRODUCTS
Oracle Primavera Cloud (OPC), Oracle Primavera P6, Oracle Primavera Risk Analysis (OPRA)
Project Earnings
Users onboarded <6 months
Faster tender planning creation
Active users
“With OPC, we're really making grounds here. It has significantly improved our project controls and collaboration.”
“The cloud system is easy to use and encourages people to commit to planning, making managing projects more efficient.”
“We really needed to get with the times. Moving away from an old P6 standalone database was a simple but crucial step towards an integrated project control solution.”
“Collaboration is key. With two-phase construction methods, you really need a collaborative platform to align risks with your client before moving to design and build.”
''The cloud system is easy to use and encourages people to commit to planning, making managing projects more efficient.''
“I received a message at 11 PM asking if I could rerun the Monte Carlo simulation with updated assumptions. I literally grabbed my iPad in the bathroom, made the changes, and emailed the results before going to bed.”
About Dura Vermeer
Dura Vermeer is a Dutch family-owned construction and infrastructure company, founded in 1855. Operating across building, infrastructure, technical installations and facility management, the company employs more than 2,700 people and maintains a strong employee satisfaction score of 8 out of 10. With annual revenues of €1.6 billion and an order book of €2.8 billion, Dura Vermeer combines innovation, sustainability, and digital transformation to drive long-term growth.
The Challenge
Dura Vermeer operates in a sector where projects are becoming more complex every year: more stakeholders, demanding engineering, strict regulations, and environmental constraints. Simultaneously, the post-COVID market and inflation linked to the war in Ukraine increased cost pressure and supply-chain uncertainty. To stay ahead, Dura Vermeer needed better visibility into planning, risk, and collaboration.
Internally, planning maturity differed across teams. Schedules were often managed in disconnected tools which made it hard to track performance, communicate timelines, or make adjustments when conditions changed. In infrastructure, where margins are often a low percentage, that lack of control can quickly turn a profitable project into a loss.
“We also see that a lot of the areas where we tend to lose money are time-related costs,” said Vincent Laging. “One day can mean the difference between writing black or red numbers.”
Dura Vermeer concluded that stronger project controls were essential to stay competitive and build long-term sustainability.
The Solution
Dura Vermeer partnered with Primaned to implement Oracle Primavera Cloud (OPC) to their strengthen project controls. As part of the Oracle Smart Construction Platform, OPC brings scheduling, task and resource management, and risk management together in one integrated system. By connecting stakeholders and synchronising activities across the project lifecycle, it supports more predictable delivery and enables proactive decision-making.
The rollout followed an Agile Scrum approach in four-week sprints. Each sprint delivered specific planning features based on user stories collected from operational teams, ensuring fast value, continuous improvement, and strong engagement. A structured MVP was used to launch the essentials first, focusing on the Schedule module, Work Plan (Task module), and Document Management.
Primaned Academy supported adoption with targeted training, helping project teams and key users build the right skills quickly. Role-based onboarding was introduced to match day-to-day needs across different groups, including planners, engineers, and subcontractors.
“We formed review teams from our operations and talked with them about what they expected from the software,” said Iman Karimi. “Each sprint we delivered something tangible based on those expectations, which kept engagement and momentum high.”
Vincent Laging, Manager of the Project Controls Department at Dura Vermeer, added: “With OPC, we're really making ground here. It has significantly improved our project controls and collaboration.”
Ultimately, OPC was chosen for its ability to create a single source of truth, improve collaboration, and support Dura Vermeer’s broad project portfolio.
The Results
The results were visible almost immediately. During the tender phase for a tunnel project, Dura Vermeer piloted Oracle Primavera Cloud using the Task module. Even with remote working during COVID, the team used OPC to improve planning and collaboration, and the structured approach helped them win the tender.
OPC also made fast high-impact decisions possible. In one case, Vincent Laging reran a Monte Carlo simulation late at night on his iPad, updated the risk profile, and shared the results in time for a critical budget decision. What used to take hours, or required desktop software, was suddenly possible from anywhere.
“This was during the pilot phase,” recalled Vincent Laging. “I received a message at 11 PM asking if I could rerun the Monte Carlo simulation with updated assumptions. I literally grabbed my iPad in the bathroom, made the changes, and emailed the results before going to bed.”
After the rollout, Dura Vermeer’s project controls processes changed fundamentally. With one unified platform, teams collaborated more easily, accessed real-time insight, and made decisions proactively. As Iman Karimi, Project Controls Manager at Dura Vermeer, put it: “The cloud system is easy to use and encourages people to commit to planning, making managing projects more efficient.” OPC improved cross-team alignment, reduced time-related cost risk, and strengthened collaboration with stakeholders.
Today, OPC is the standard across Dura Vermeer’s infrastructure and building projects, from weekend maintenance to multi-year programmes such as A12 bridge renovations and Europe’s largest onshore wind field. It has replaced Microsoft Project and Excel for more than 1,100 active users, while a hybrid integration with Primavera P6 supports long-term projects that require contractual compliance.
“We did not just implement a tool,” said Iman Karimi. “We implemented a new way of working.”
Looking ahead, Dura Vermeer is expanding OPC further, including portfolio planning and integrated risk management. Launching a dedicated OPC instance for the Gelregroen programme underlines their commitment to digital project delivery, and positions OPC as a key enabler in their long-term strategy.
Expert consulting and implementation for Project Controls software
Primaned is trusted for delivering advanced solutions in project controls. As a leading European reseller and implementation partner for PMWeb and Oracle Primavera, we offer a comprehensive portfolio of tools tailored to complex project environments. Explore proven expertise in planning, risk, and construction management information systems.
Related Case Studies
Discover practical solutions and proven results from real projects in our Case Study Hub.
Strukton Infra Specials
Read why Strukton Infra Specials called their move to Oracle Primavera Cloud ‘A logical decision’
Carl Zeiss
Discover how Carl Zeiss improves their Corporate Real Estate Management process by implementing PMWeb. Learn more about the results they achieved following this successful project in the case study.
